Quick answer: change the model, renew the certification, build the tooling and spare stock. None of the three fits into peak season — and all three decide whether you make the next one.
Start with a question: why does a redesign requested in peak season always come back as “after this season”?

Here is a typical example. In October you ask for a new housing; the factory says wait until the season ends. By March the mould shop is booked against May Day stock; by June you give up and keep selling the old model. A year is gone, the product has not changed, and competitors have quietly walked your price down.
It is not reluctance. The schedule is genuinely full: in peak the moulding machines are full, the sample technician is full, even the packing line is chasing orders. A redesign cannot be inserted; it can only queue.
Langfang Jindu Household Products Co., Ltd. · 15 years of expertise · https://jindubrand.com/
So the off-season is not for discounting old stock. It is for three jobs — and only a factory that owns the mould and the motor can move fast on them. Mould, injection, metal stamping, motor and assembly sit in one park, so a changed part runs the same day.
Redesign: a new housing runs from structure to tooling, trial shots and a pilot batch in 25–40 days — the quiet month fits it. Certification: CE (LVD and EMC), ETL, SASO, INMETRO take four to twelve weeks depending on the lab queue; start a month before peak and the certificate misses the vessel. Tooling and spares: blade plates, augers and seals are consumables — 1.5%–3% of volume prepared now is what stops an eight-dollar seal from halting a line in November.
Founded in 2018, 8,500 m², 200+ employees, 10,000 units a day, 12-month warranty.
The order of the three jobs matters. Certification first, because it depends on a lab queue you do not control; tooling second, because trial shots have to happen before the pilot batch; spare parts last, because they are pure arithmetic on your own failure rate.

An off-season project also has a shorter paper trail: one engineering meeting, one 3D file, one tooling deposit, and the next contact is a sample in a carton. In peak season the same project needs six approvals and a slot that does not exist.
We usually propose three options on the existing platform rather than a new project: another colour, another plug, another jar set. Cheaper, faster, and it still sells in the same season.
Peak season is a fight for capacity; the off-season is a fight for time. Send the redesign now and it will be stock before the next peak.